Construction Site Props & Equipment Pack is a detailed collection of construction site assets designed for architectural visualization, industrial scenes, environment design, animation and 3D projects.
The pack includes a wide variety of construction equipment, materials and site props such as a construction site office/container, scaffolding, cement bags, wooden pallets, pipes, electrical equipment, safety barriers, warning signs, fire extinguishers, hoses, fuel tank, water tanks, construction lumber, steel rods and other construction accessories.
All models were created in 3ds Max with attention to realistic proportions and detailed surface appearance. The presentation renders were created using V-Ray 5.