Killer Whale Rigged 3D Model

$99

Standard License | Upgrade License
Formats (8)
Free file format Conversions available
Native | 3ds Max 2012 | V-Ray 2.3
3ds Max 2012 | Default Scanline
glTF
3ds Max
USD
Specifications
Publish Date November 20, 2017
Product ID 1225613
Polygons 11,058
Vertices 11,333
Polygonal Quads/Tris Geometry
Textures
Materials
UV Mapped
Non-overlapping Unwrapped UVs
Rigged
PBR
member avatar
3d_molier International
90751 Products | Contributor Since 2015
Have questions? Chat with us now.

Description

Killer Whale Rigged 3D Model is a high quality, photo real 3d model that will enhance detail and realism to any of your rendering projects. The model has a fully textured, detailed design that allows for close-up renders, and was originally modeled in 3ds Max 2012 and rendered with V-Ray. Renders have no postprocessing.
Hope you like it!

Killer Whale fully rigged with bones and skin system in 3D Studio Max.
You can easily position it the way you need or animate it the way your project requires using helpers in 3D Studio Max.
See the turntable and renders to get an idea of how rigging works.
*********************************
Features:
- High quality polygonal model, correctly scaled for an accurate representation of the original object.
- Models resolutions are optimized for polygon efficiency. (In 3ds Max, the Meshsmooth function can be used to increase mesh resolution if necessary.)
- All colors can be easily modified.
- Model is fully textured with all materials applied.
- All textures and materials are included and mapped in every format.
- 3ds Max models are grouped for easy selection, and objects are logically named for ease of scene management.
- No part-name confusion when importing several models into a scene.
- No cleaning up necessaryjust drop your models into the scene and start rendering.
- No special plugin needed to open scene.
- Model does not include any backgrounds or scenes used in preview images.
- Units: cm
*********************************
File Formats:
- 3ds Max 2012 V-Ray and standard materials scenes
*********************************
Textures Formats:
- (4 .png) 4096 x 4096
*********************************
3d Molier International is a team of 3D artists with over a decade of experience in the field. The company participated in various projects allowing us to learn our clients needs. Every model we build goes through thorough Quality assessment both visual and technical to make sure the assets look realistic and the models are of the best quality, which you can tell by looking at the renders none of the has any postprocessing. On the top of that all the models come with complete UVs and optimized topology, which allows you in no time alter geo or the textures if needed.

Also check out our other models, just click on our user name to see complete gallery.
3d_molier International 2017

Select Enhanced License

  • $10,000 in Legal Protection (Indemnification)
  • Uncapped Legal Protection (Indemnification)
  • Waiver from injunctive relief
  • Assignable model rights
  • $1,000,000 in Legal Protection (Indemnification)
  • Waiver from injunctive relief
  • Assignable model rights
  • $250,000 in Legal Protection (Indemnification)
  • Assignable model rights
Read more about enhanced license tiers, or contact us at enterprise@turbosquid.com. Already a Shutterstock Enterprise Customer? Contact your Shutterstock Sales Support Agent to talk about adding 3D.

About Conversion Requests

To submit a conversion request for a purchased asset, please complete our Conversion Request Form.

If you have not yet purchased a model, please review our Documentation about Conversions to learn about what limitations you may encounter with a conversion.

For any additional questions about a model’s suitability for conversion, please contact TurboSquid Support.

Loading...