uss tarawa lha 1 3d model - USS TARAWA LHA 1 amphibious assault ship... by De Espona

Rate & Review Product

Please wait...
USS TARAWA LHA 1 amphib...
$75.00
uss tarawa lha 1 3d model - USS TARAWA LHA 1 amphibious assault ship... by De Espona
uss tarawa lha 1 3d model - USS TARAWA LHA 1 amphibious assault ship... by De Espona
uss tarawa lha 1 3d model - USS TARAWA LHA 1 amphibious assault ship... by De Espona
uss tarawa lha 1 3d model - USS TARAWA LHA 1 amphibious assault ship... by De Espona
USS Tarawa (LHA-1) is a United States Navy amphibious assault ship, the lead ship of her class, and the second ship to be named for Tarawa Atoll, site of a Marine landing during World War II. The first Tarawa was the USS Tarawa (CV-40).

She was laid down in November 1972 at Pascagoula, Mississippi, by Ingalls Shipbuilding, launched 1 December 1973, sponsored by Audrey B. Cushman, the wife of General Thomas J. Cushman, former Commandant of the Marine Corps; and commissioned on 29 May 1976, Capt. James H. Morris in command.

Tarawa is the first of five ships in a new class of general-purpose amphibious assault ships and combines in one ship type the functions previously performed by four different types: the amphibious assault ship (LPH), the amphibious transport dock (LPD), the amphibious cargo ship (LKA), and the dock landing ship (LSD). She is capable of landing elements of a Marine Corps battalion landing team and their supporting equipment by landing craft, by helicopters, or by a combination of both.

The ship departed Pascagoula on 7 July 1976 and set a course for the Panama Canal. She transited the canal on 16 July and, after a stop at Acapulco, Mexico, arrived at San Diego, California on 6 August. During the remainder of 1976, the amphibious assault ship conducted trials, tests, and shakedown in the southern California operating area.

During the first half of 1977, Tarawa was engaged in training exercises off the California coast. On 13 August, she entered Long Beach Naval Shipyard for post shakedown availability which was completed on 15 July 1978. Following four and one half months of intensive individual ship and amphibious refresher training with embarked marines, Tarawa ended 1978 in her home port of San Diego on Christmas stand down.

Related Products
$.00
ma 3ds max dxf lwo obj X fbx 3dm dwg
$.00
ma 3ds max lwo obj xsi oth
$.00
ma 3ds max lwo obj fbx oth
$.00
max oth
$.00
lwo c4d lxo
$.00
3ds max obj oth
$.25
3ds
More Products by this Artist
$.00
max
$.00
max
$.00
max
$.00
max
$.00
max
$.00
max
$.00
max

Product File Downloads
3ds Max (.max)  2.4 MB
Share Share Share Share
Product License
Standard Royalty FreeView License
FAQ
3D Model Specifications
Product ID:402019
Published:
Geometry:Polygonal
Polygons:264,320
Vertices:0
Textures:Yes
Materials:Yes
Rigged:No
Animated:No
UV Mapped:Unknown
Unwrapped UVs:Unknown
Product Rating
1 Rating Submitted
d3rdproductions
Oct 10, 2010