chernobyl reactors 3d max - Chernobyl by NeoLight

Rate & Review Product

Please wait...
Chernobyl
$15.00
chernobyl reactors 3d max - Chernobyl by NeoLight
chernobyl reactors 3d max - Chernobyl by NeoLight
chernobyl reactors 3d max - Chernobyl by NeoLight
chernobyl reactors 3d max - Chernobyl by NeoLight
chernobyl reactors 3d max - Chernobyl by NeoLight
chernobyl reactors 3d max - Chernobyl by NeoLight
chernobyl reactors 3d max - Chernobyl by NeoLight
chernobyl reactors 3d max - Chernobyl by NeoLight
chernobyl reactors 3d max - Chernobyl by NeoLight
The description of the nuclear power plant:
The Chernobyl station (51°23?14?N, 30°06?41?E) is situated at the settlement of Pripyat, Ukraine, 11 miles (18 km) northwest of the city of Chernobyl, 10 miles (16 km) from the border of Ukraine and Belarus, and about 70 miles (110 km) north of Kiev. The station consisted of four reactors, each capable of producing 1 GW of electric power (3.2 gigawatts of thermal power), and the four together produced about 10% of Ukraine's electricity at the time of the accident. Construction of the plant began in the 1970s, with reactor No. 1 commissioned in 1977, followed by No. 2 (1978), No. 3 (1981), and No. 4 (1983). Two more reactors (No. 5 and No. 6, also capable of producing 1 gigawatt each) were under construction at the time of the accident.
The four plants were designed as a type of reactor called RBMK-1000.


A brief story to remember what happened that day:
On 25 April, prior to a routine shut-down, the reactor crew at Chernobyl-4 began preparing for a test to determine how long turbines would spin and supply power following a loss of main electrical power supply. Similar tests had already been carried out at Chernobyl and other plants, despite the fact that these reactors were known to be very unstable at low power settings.
A series of operator actions, including the disabling of automatic shutdown mechanisms, preceded the attempted test early on 26 April. As flow of coolant water diminished, power output increased. When the operator moved to shut down the reactor from its unstable condition arising from previous errors, a peculiarity of the design caused a dramatic power surge.
The fuel elements ruptured and the resultant explosive force of steam lifted off the cover plate of the reactor, releasing fission products to the atmosphere. A second explosion threw out fragments of burning fuel and graphite from the core and allowed air to rush in, causing the graphite moderator to burst into flames.
Some 5000 tonnes of boron, dolomite, sand, clay and lead were dropped on to the burning core by helicopter and so called heroic “liquidators” in an desperate effort to extinguish the blaze and limit the release of radioactive particles.


NeoLight

Recently Viewed Products
$.00
ma 3ds max obj c4d fbx
$.00
ma 3ds max obj c4d fbx
$.00
ma 3ds max obj c4d fbx
$.00
ma 3ds max obj c4d fbx
$.00
max lwo lxo
$.00
ma max
$.00
max 3ds c4d lwo ma obj xsi
Related Products
$.00
3ds dxf obj br4
$.00
lwo
$.00
ma max obj c4d fbx oth
$.00
max oth
$.00
3ds c4d
$.00
3ds dxf obj c4d
$.00
3ds max oth
More Products by this Artist
$.00
max
$.00
max
$.00
max
$.00
max
$.00
max
$.00
max
$.80
max
Product File Downloads
3ds Max 8.0 (.max)  1.7 MB
Ask us anything about this product...
on all products sold by TurboSquid
free conversions to popular formats
Product License
Standard Royalty FreeView License
FAQ
3D Model Specifications
Product ID:306072
Published:Apr 26, 2006
Geometry:Polygonal
Polygons:120,000
Vertices:0
Textures:Yes
Materials:Yes
Rigged:No
Animated:No
UV Mapped:Unknown
Unwrapped UVs:Unknown
Product Rating
1 Rating Submitted