3d model swivel joint flowline - Swivel Flowline Joint by emma j

Rate & Review Product

Please wait...
Swivel Flowline Joint
by emma j
$20.00
3d model swivel joint flowline - Swivel Flowline Joint by emma j
3d model swivel joint flowline - Swivel Flowline Joint by emma j
3d model swivel joint flowline - Swivel Flowline Joint by emma j
3d model swivel joint flowline - Swivel Flowline Joint by emma j
3d model swivel joint flowline - Swivel Flowline Joint by emma j
3d model swivel joint flowline - Swivel Flowline Joint by emma j
3d model swivel joint flowline - Swivel Flowline Joint by emma j
3d model swivel joint flowline - Swivel Flowline Joint by emma j
This super high detail, high poly model is a pristine representation of a swivel joint system, used in flowline operations including fracking. These rotating joints can be positioned to accompany flowline directional needs. Native max scene elements are linked, and pivot points positioned correctly, making the model ready to animate. Max scene also include vray lighting setup, set, and materials.
Recently Viewed Products
$.00
3ds max
$.00
max
$.00
ma 3ds obj c4d fbx
$.00
3ds lwo obj c4d fbx blend stl
$.00
3ds max obj oth
$.00
c4d
$.50
ma obj
Related Products
$.00
3ds max dxf obj
$.00
3ds max obj
$.00
3ds obj oth
$.50
3ds obj blend
$.20
3ds max obj c4d
$.00
3ds max dxf obj wrl fbx w3d
$.95
3ds max obj
More Products by this Artist
$.00
3ds max obj
$.00
3ds max obj
$.00
3ds max obj
$.00
max obj
$.00
3ds max obj
$.00
3ds max obj
$.00
3ds max obj fbx
Product File Downloads
3ds Max 9 (.max)  15 MB
Renderer:V-Ray 1.5
OBJ (.obj)  23 MB
3D Studio (.3ds)  5.0 MB
Ask us anything about this product...
on all products sold by TurboSquid
free conversions to popular formats
Product License
Standard Royalty FreeView License
FAQ
3D Model Specifications
Native file format:3ds Max 9
Product ID:622367
Published:Aug 12, 2011
Geometry:Polygonal
Polygons:120,000
Vertices:125,000
Textures:No
Materials:Yes
Rigged:No
Animated:No
UV Mapped:No
Unwrapped UVs:No
Product Rating
Unrated